Location

The logistics center is located in the InterPark, the intermunicipal industrial park between the communities of Großmehring and the market town of Kösching in the district of Eichstätt. The Interpark is one of the most important industrial parks in southern Germany, and is located in the immediate vicinity of to Ingolstadt and the catchment area of the metropolitan regions of Munich and Nuremberg.

A broad and well-developed road system, the direct rail connection with its own marshalling yard and two independent direct motorway connections to the A9 (Lenting junction, Ingolstadt-Nord junction) are also strategic features of this location.

Nicolaus-Otto-Ring
85098 Großmehring
Germany

13,268

Clear Height
12m

142,815

SITE & BUILDING SPECS

13,268

142,815

Total Size of Property 19,459 SQ M
(209,455 SQ FT)
Warehouse 10,588 SQ M
(113,969 SQ FT)
Office 618 SQ M
(6,652 SQ FT)
Mezzanine 2,062 SQ M
(22,195 SQ FT)
Car parking spaces
43
Trailer parking spaces
3
Dock Doors
12
Drive in Ramps
2
Floor loading capacity
7t/m²
Clear Height
12 m
ESFR-Sprinkler-System FM Global

Economic Region

The fast and cost-effective accessibility of business partners and consumers (in the western and southern countries as well as the emerging eastern European states) distinguishes Ingolstadt. More than 10 million inhabitants can be reached within two hours, 19.3 million within 3 hours and a total of 68.2 million within 6 hours. The proximity to the Danube (the most important European waterway) and the well-developed, modern fiber optic network are also strategic advantages.

A high industrial quota and high job density characterize this economically strong region with excellent prospects for growth. Several well-known companies from the automotive, service and trade sectors are located locally and the first-class infrastructure thus enables worldwide distribution.

LOCATION AND TRAVEL DISTANCES

Destination Km
Munich Airport
73
Munich
81
Nuremberg
95
Destination Km
Regensburg
98
Augsburg
84

SUSTAINABLE EXCELLENCE

GLP’s logistics- and distribution properties meet high sustainability criteria worldwide through environmentally sound building solutions. All new developments in Germany are certified to at least the DGNB Gold standard, making them more cost-effective to operate and maintain. In addition to reducing operating costs for users, GLP contributes to sustainability by improving the CO2 balance, reducing energy and water consumption, and selecting certified and recyclable building materials.

Contact

    Please contact me via: E-MailTelephone

    I agree that my data from the contact form are raised and processed to the answer of my inquiry. The data will be deleted after your request has been processed.

    *required

    Michael Gerke

    Head of Development Germany

    Taunusanlage 1 – Skyper, 18. OG
    60329 Frankfurt am Main
    Germany

    Marketing Partner

    Axel Schmidt
    Senior Consultant Logistics & Industrial Advisory

    T: +49 (0)173-744 38 15
    axel.schmidt@bnpparibas.com

    Leopold Hairer
    Senior Consultant Logistics

    T: +49 (0)160-719 40 13
    leopold.hairer@bnpparibas.com